40322887

Plea to Save Historic Gloucester Building and Former School from Demolition

A historic former school and day centre in Gloucester is facing demolition, sparking a strong community campaign to preserve the cherished landmark. Developers plan to demolish the former Hatherley Road Day Centre and school buildings in Barton to make way for new housing, but opposition from local residents and councillors is mounting.

A recent application concerning the method of demolition was rejected, signaling resistance to the proposed plans. Dozens of residents have voiced their concerns, emphasizing the cultural and historical importance of the Victorian-era building.

Liberal Democrat councillor Sarah Sawyer, responsible for planning at Gloucester City Council, is actively opposing the demolition. She urges the developer to reconsider and incorporate the historic building into future development plans.

READ MORE: Gloucester’s Historic Blackfriars Priory Reopens for Limited Festival Events

READ MORE: Tom Kerridge Acknowledges Public Frustration Over High Restaurant Prices

“Hatherley Road Day Centre in Barton and Tredworth is under threat,” she said. “Although the building is not nationally listed, it holds a place on Gloucester’s local list of heritage assets, recognizing its importance to the city’s history and character.”

Built between 1899 and 1901, the building’s local listing reflects its significance to the community, even though it does not provide the same legal protections as national listing. Councillor Sawyer highlighted the limited window for intervention before the developer submits a new application, stressing the need to protect this historic site.

The building has been part of the local fabric for over a century and is deeply valued by residents. “It is cherished by the community, and its demolition would negatively impact the street scene,” Sawyer said. “The building holds so much history and character that should not be lost.”

Labour Councillor Roseanna Marshall, representing Barton and Tredworth, echoed these sentiments, applauding the council’s refusal of the prior approval application. “The building is sentimental to many in the area. Losing it would mean losing a significant part of our heritage,” she noted. “I hope the owner will give careful consideration to redevelopment options that preserve the building.”

Councillor Usman Bhaimia also expressed his desire to save the building, emphasizing the emotional bond local families have with the site. “Many local parents who attended the school feel a strong attachment to the building. It later became a day centre, a vital community hub where elderly residents would gather and socialize.”

On the other side, planning consultants working for the developer maintain that demolition is necessary for redevelopment. They project that demolition could begin in August 2026 and finish by December 2026, clearing the way for new housing—subject to planning permission. Their documents state that there are no plans to preserve or rebuild any part of the existing structures.

As the debate continues, the community and local representatives advocate strongly for a solution that respects Gloucester’s heritage while allowing for responsible development.

SUBSCRIBE FOR UPDATES


No spam. Unsubscribe any time.