Motorists are bracing themselves for significant traffic disruptions as the Netheridge Swing Bridge will be closed around the clock for 12 days starting Monday. The closure is necessary for crucial repair work to ensure the bridge’s safety and longevity.
The bridge, a key route on a busy A-road, is expected to cause widespread delays due to the 24/7 shutdown. Drivers are already expressing frustration and planning to avoid travel during the closure. Local authorities have arranged diversion routes, but these are anticipated to extend journey times considerably.
Commuters are advised to prepare for extended travel times or consider alternative transportation options where possible. The repair work aims to be completed efficiently to restore normal traffic flow as soon as possible.