A crucial stretch of the A419 at Cowcombe Hill near Chalford, close to Stroud, will be closed for 11 days to facilitate ground investigations as part of efforts to stabilise the area and prepare for road repairs.
Gloucestershire County Council has been monitoring this section of the A419 for several years due to ongoing ground movement beneath the road, which has caused visible cracking in the carriageway. The council warns that if left unaddressed, the landslip could compromise the long-term safety, resilience, and reliability of this principal route connecting Stroud and Cirencester.
Extensive monitoring, surveys, and ground investigations have been conducted to understand the problem and determine the best long-term engineering solution. However, recent extreme weather conditions have delayed the main repair works. It is now vital to collect more detailed ground movement data before the winter months to ensure road stability and safety.
READ MORE: Pedestrian in Stable Condition Following Collision with Car in Gloucester
READ MORE: James Hayes joins Gloucestershire on a permanent two-year deal
The next phase involves further ground investigations to provide comprehensive information about the hillside’s condition and to finalise the design of the preferred solution. To carry out this work safely, the road will be fully closed from Tuesday, 29 September until Friday, 9 October 2026.
The council has pledged to keep disruptions to a minimum and to give advance notice of all traffic management measures. Originally, the main construction was due to start earlier, but following consultations with local stakeholders and commoners, concerns were raised about the effect of major construction activities on cattle grazing during spring and summer.
Taking these concerns into account, the project timeline has been revised. Subject to completing detailed designs and obtaining necessary approvals, main construction is now scheduled to begin in November 2027. This adjustment reflects the council’s dedication to balancing essential highway improvements with community needs.
Councillor Mark Harris, cabinet member for highways, said: “Cowcombe Hill is a vital route for local communities in the Stroud area and for travellers across Gloucestershire. The ongoing ground movement means we must act to protect this important section of road and prevent further deterioration.
“We understand that temporary closures cause inconvenience, and we thank residents, businesses and road users for their patience during these important investigations. The data collected will enable us to develop a long-term solution to enhance the route’s resilience for years to come.
“We have also carefully considered feedback from local stakeholders and commoners about construction impacts on cattle grazing. By revising the programme, we aim to deliver the scheme while respecting the needs of the local community.”